Prerequisite(s): A contract must have been created and saved.
A contract or supplemental schedule must already have been created and saved to the contract.
1. From your homepage, click the Contract Name link in the Name column of the Contract List.
2. Hover your mouse over the Planning, Specifications & Estimating, Procurement Opportunity or Contract Management links on the menu bar.
3. Click the Manage Schedules sub-link from the menu bar.
4. Under either the ‘Contract Schedule’ or ‘Other Schedules’ section, click the ‘Online Scheduler’ icon () to open the latest version of the schedule in the online scheduler. If the schedule was created in the Online Scheduler then you may simply click the schedule name to open it in the Online Scheduler.
Note: Only the designated contract role can create and manage a project’s contract schedule. Only one contract schedule can be created for a contract. Only the schedule originator can revise the schedule.
5. Edit the schedule as needed using the online scheduler.
6. Click the ‘Check-in Changes’ button to automatically save your updates as a new version of the schedule.
Note: The Online Scheduler provides a toolbar for ease of use in creating and editing your schedule(s). Each toolbar icon is identified in the graphic below (see Screen Shot). If you mouse-over each icon in the online scheduler the icon definition below is displayed.